Home » 5.7 Hemi » 5.7 Hemi – MANIFOLD – INTAKE – INSTALLATION

5.7 Hemi – MANIFOLD – INTAKE – INSTALLATION

1. Install intake manifold seals.
2. Position intake manifold and IAFM.
3. Install intake manifold retaining bolts, and tighten in sequence from the middle bolts towards the outside in a
crisscross pattern. Torque fasteners to 12 N·m (105 in. Ibs.).
4. Connect electrical connectors for the following components:
• Manifold Absolute Pressure (MAP) Sensor
• Intake Air Temperature (IAT) Sensor
• Throttle Position (TPS) Sensor
• Coolant Temperature (CTS) Sensor
• Idle Air Control (lAC) Motor
5. Install generator.
6. Install AlC compressor.
7. Connect Brake booster hose and Positive crankcase ventilation (PCV) hose.
8. Install resonator assembly and air inlet hose.
9. Connect negative cable to battery.