Home » Cummins N14 » Cummins N14 – Metri-Pack Pass Through Connector – Replacement – Installation

Cummins N14 – Metri-Pack Pass Through Connector – Replacement – Installation

Install the new pass through connector. Connect the pass through connector to the injector solenoid wires. Insert
the pass through into the rocker lever housing. Tighten the capscrew.
Torque Value: 15 N•m [11 ft-lb]
Connect the actuator harness to the pass through. Install a new plastic wire tie, Part No. 3062329.