Home » ISX11.9 CM2250 - Service Manual » Cummins ISX11.9 CM2250 – Service Manual 011-066   EGR Mass Measurement Flow Assembly

Cummins ISX11.9 CM2250 – Service Manual 011-066   EGR Mass Measurement Flow Assembly

Table of Contents

Install

Install

TOC

Remove the protective caps used from the Air Handling Clean Care Kit, Part Number 4919799, to cover open points on the air handling system.

SMALL | MEDIUM | LARGE


Push the o-ring over the flow assembly pilot by hand.

The o-ring must remain square during installation. Do not allow the o-ring to roll or twist.

SMALL | MEDIUM | LARGE
   


Before installing the EGR mass measurement flow assembly, coat the clamping surface of the V-bands with high temperature anti-seize compound.

If the V-band clamp was removed, loosely install the V-band clamp over the inlet side of the EGR mass measurement flow assembly.

SMALL | MEDIUM | LARGE
   


Install the EGR mass measurement flow assembly to the EGR valve by sliding the V-band in place.

Loosely install the two EGR mass measurement flow assembly mounting capscrews.

Tighten the V-band clamp.

Torque Value:  12  n.m  [106 in-lb]

Tighten the two mounting capscrews.

Torque Value:  45  n.m  [33 ft-lb]

SMALL | MEDIUM | LARGE
Last Modified:  28-Jun-2010