General Information NOTE: This procedure is for front gear train engines only. For front gear train engines, a rear crankshaft seal carrier is mounted to…
Category: 6.7L Cummins
Install Rear Gear Train To aid in installation, apply a mild soap to the outside diameter of the seal case (A). NOTE: On engines equipped…
Install Rear Gear Train NOTE: Before installing the flywheel housing, make sure any locating dowel rings are in the same position as when the flywheel…
Install Prior to installing the EGR connection tube V-band clamps, coat the clamp surfaces with high-temperature anti-seize compound. Install the EGR connection tube. Use new…
Install NOTE: Make sure to install any previously removed spacers between the EGR valve and air intake connection. The spacers will require an additional set…
Install Two Piece Air Intake Connection Adapter Install the o-ring seal in the groove of the air intake connection adapter. Install the air intake connection…
Install Install the air intake connection gasket and air intake connection. Install and tighten the capscrews. Torque Value: 24 N•m [ 212 in-lb ]
Install Install the turbocharger coolant supply hose by connecting the hose to the fittings to the cylinder block and into the bottom of the turbocharger…
EGR Cooler Coolant Supply Line • For Rear Gear Train engines, if disassembled, assemble the EGR cooler supply line onto the EGR cooler and install …
Install NOTE: Install a light coating of high temperature anti- seize compound to the threads of the exhaust gas pressure sensor tube prior to installation.…