Diesel Engines Troubleshooting

Diesel Engines Repair

Skip to content
Menu
  • Home
  • About Me
  • Contact Us

Category: John Deere

1025R

1023E, 1025R and 1026R – Inspect Cylinder Bore

Posted on June 6, 2022

Cylinder Bore Measurement Inspection Measure cylinder bore diameter at three positions; top, middle, and bottom. At these three positions, measure in both directions; along crankshaft…

1025R

1023E, 1025R and 1026R – Assemble Piston and Connecting Rod

Posted on June 6, 2022

[1] – IMPORTANT: Pistons must be installed on the same connecting rod they were removed from. →NOTE: Apply clean engine oil to all parts during…

1025R

1023E, 1025R and 1026R – Disassemble and Inspect Piston and Connecting Rod

Posted on June 6, 2022

[1] – Inspect all parts for wear or damage. Replace as necessary. [2] – Measure crankshaft connecting rod journal diameter. [3] – Install connecting rod…

1025R

1023E, 1025R and 1026R – Remove Piston and Connecting Rod

Posted on June 6, 2022

[1] – IMPORTANT: Pistons must be installed in cylinders from which they were removed and in the same direction. Be careful not to damage crankshaft…

1025R

1023E, 1025R and 1026R – Remove Piston and Connecting Rod

Posted on June 6, 2022

[1] – Remove oil pan and oil pickup tube. [2] – Remove cylinder head. [3] – Check cylinder bore for ridges. These ridges can damage…

1025R

1023E, 1025R and 1026R – Check Crankshaft Main Bearing Clearance

Posted on June 6, 2022

[1] – →NOTE: The engine must be removed from the machine to perform this test. Remove the flywheel from the crankshaft. (See Remove and Install…

1025R

1023E, 1025R and 1026R – Check Connecting Rod Bearing Clearance

Posted on June 6, 2022

[1] – Remove connecting rod cap. [2] – Wipe oil from bearing insert and crankshaft journal. [3] – Put a piece of Plastigage TM (A),…

1025R

1023E, 1025R and 1026R – Check Crankshaft End Play

Posted on June 6, 2022

[1] – Fasten dial indicator (A) to engine and position indicator tip on end of crankshaft (B). [2] – Zero the dial indicator. [3] –…

1025R

1023E, 1025R and 1026R – Check Connecting Rod Side Play

Posted on June 6, 2022

Insert a feeler gauge (A), according to specifications, between connecting rod cap and crankshaft. If side play exceeds specification, replace connecting rod.

1025R

1023E, 1025R and 1026R – Remove and Install Oil Pan and Strainer: 3TNV76 and 3TNV80

Posted on June 4, 2022

[1] – →NOTE: Approximate oil pan capacity is 2.6 L (2.75 qt.). Drain oil. [2] – Remove cap screws from oil pan (G) and remove…

Posts navigation

Previous Page Page 1 … Page 31 Page 32 Page 33 … Page 35 Next Page

Pages

  • About Me
  • Contact Us

Recent Posts

  • KOHLER KDW 702 – Camshaft, disassembly
  • KOHLER KDW 702 – Rocker arm pivot, dismounting and remounting
  • KOHLER KDW 702 – Pump/injector unit – Disassembly
  • KOHLER KDW 702 – Pump/injector unit – non-return valve
  • KOHLER KDW 702 – Fuel rail

Categories

  • 1025R
  • 2004 6.0L Power Stroke
  • 2008 6.6L Duramax
  • 3406 B/C PEEC Repair Manual
  • 5.7 Hemi
  • 6.4L 392 HEMI V-8
  • 6.4L Power Stroke
  • 6.7L Cummins
  • 6.7L Power Stroke
  • 62L-V8
  • 7.3L Power Stroke
  • Blog
  • BMW M57
  • Common Rail
  • Cummins 4BT
  • Cummins N14
  • Diesel Fuels & Diesel Fuel Systems
  • Duramax LLY
  • FUSO 4M4
  • GM 6.5
  • International DT466
  • ISX11.9 CM2250 – Service Manual
  • KOHLER KDW 702
  • L2501
  • OM 617
  • Power Stroke 6.0L
  • Uncategorized

Engineering Update

Wi-Fi HaLow
Rockwell Automation New Panel and Box Industrial PCs
EXAIR’s Augmented Reality Web App
Lubrizol ISCC PLUS Certification
© Copyright 2026 – Diesel Engines Troubleshooting
Wisteria Theme by WPFriendship ⋅ Powered by WordPress

Privacy Policy